American Telecom SL PTG012 Cell Phone User Manual


 
AMERI*CAN TELECOM INC.
Technical Document
SL PTG012 Installation Instructions Page 3
3. Attach each PTQ365 charger to the housing using two (2) nylon spacers (p/n
180100-00) under the charger, and two (2) #6-19 screws (p/n 180012-00) per
charger.
PTQ365
4. Plug a power supply jack into each charger.
5. Plug in the AC power cord to turn power on. Verify that each charger LED is lit
solid red.
6. Place a SPECTRALINK battery into each charger position.
Verify that each charger LED is lit solid green.
Battery
LED
Enclosure Installation
The SL PTG012 SpectraLink Phone and Charging station can be placed on a table or can
be wall mounted. When wall mounted, the enclosure can be mounted horizontally or
vertically, using a Philips screwdriver and the included mounting hardware. To mount the
SL PTG012 Station to the wall, install the enclosure as follows:
1. Locate the four screws and anchors supplied with the kit.