HTC Rev. A05 Cell Phone User Manual


 
6/30/2008 2:31:32 PM
Doc. No. DOC-00040624
REV.
Issued Date 2008/4/14
.
Revised Date 2008/6/23
A05
Doc. Title
Diamond Service Manual
Page 74 of 109
HTC CONFIDENTIAL
SM-TP001-0704
HTC Corporation
5.2 Battery rundown test procedure
Test Requirement:
-Windows 2000/XP
-USB Cable
-ActiveSync 4.2 above (WINCE 6.0 sho
uld use ActiveSync 4.5)
-Master Unit
-Battery in Warranty
Caution: Please charge your unit to full capacity for battery (until the green light
is displayed) before doing the test.
TEST PROCEDURE
Connect device to PC
I. Setting and allow USB
connections in Microsoft
ActiveSync.
II. Connect your device and desktop/
or laptop via USB cable.
III. Check the pop-up message from
Microsoft ActiveSync when
device is synchronized with PC.
Copy the Battery Rundown tool into the device
IV. Make a folder in the device.
V. Copy
PowerDetect.exe into the
folder.