5
2. INSTALLATION
2.1 UNPACKING
UNPACKING
• Inspect the outside of the package for shipping damage. If there is evidence of
shipping damage, contact the shipping carrier immediately.
• Remove the punch from its shipping carton.
• Inspect for any concealed damage to unit. If there is evidence of concealed
shipping damage, contact the shipping carrier immediately.
• Remove all shipping tape from doors and levers.
2.2 UNIT SET-UP
Step One: Connect the communication cable.
Step Two: Connect the power cord.
2.3 UNIT OPERATION
• Check to ensure that the paper chip tray is securely in place.
• Check to ensure that a Die Set is installed properly and that any extra Die Sets are
securely stored in the Die Storage Area.
• Run a small test job in “Bypass” mode. Check to ensure that the job is not
punched and bypasses properly.
• Run a small job with Punch Enabled. Check the punched holes of the job.