![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/5/f3/5f35ff9a-490b-9194-d1ff-bf5e8b064405/5f35ff9a-490b-9194-d1ff-bf5e8b064405-bg4d.png)
75
Settings
Schedule Setting (Continued)
Item Description
Specific date No1 Configures the specific date (No.1) schedule.
Schedule
Click the [Enable] check box to enable specific date (No.1)
scheduling.
Month/Day Configures the Month and date.
Schedule List Displays the current specific date (No.1) schedule.
Specific date No.2 Configures the specific date (No.2) schedule.
Click the [Apply] button to save the settings.
Schedule
Click the [Enable] check box to enable specific date (No.2)
scheduling.
Month/Day Configures the Month and date.
Schedule List Displays the current specific date (No.2) schedule.
Specific date No.3 Configures the specific date (No.3) schedule.
Schedule
Click the [Enable] check box to enable specific date (No.3)
scheduling.
Month/Day Configures the Month and date.
Schedule List Displays the current specific date (No.3) schedule.
Specific date No.4 Configures the specific date (No.4) schedule.
Schedule
Click the [Enable] check box to enable specific date (No.4)
scheduling.
Month/Day Configures the Month and date.
Schedule List Displays the current specific date (No.4) schedule.
Specific date No.5 Configures the specific date (No.5) schedule.
Schedule
Click the [Enable] check box to enable specific date (No.5)
scheduling.
Month/Day Set the Month and date.
Schedule List Displays the current specific date (No.5) schedule.