A SERVICE OF

logo

5/25/2004 4001-386-01D
FloScan Instrument Company, Inc.
Tel: (206) 524-6625 Fax: (206) 523-4961
3016 NE Blakeley Street, Seattle, WA 98105 email: service@floscan.com http://www.floscan.com
VI. Calibration:
When system is running properly, refer to the calibration instructions and calibrate your system.
USCG approved fuel hose with either fabric or wire reinforcing braid meet the following standards:
Hose Marking Permeation Rating 2½ Minute Fire Test
USCG Type A-1 100g/m²/24hrs. Required
USCG Type A-2 300g/m²/24hrs. Required
USCG Type B-1 100g/m²/24hrs. Not Required
USCG Type B-2 300g/m²/24hrs. Not Required
Table I
Installation Do’s & Don’ts
Do Don’t
Use a Fuel Proof Pipe Thread Sealant when
assembling fittings into fuel system components,
(Locktite PST, Leak-Lock, or equivalent).
Never use Teflon Tape!
Use thin wall, low pressure, full flow type NPT or
NPTF hose barb fittings.
Don’t use Push-Lok, or Barb-Tite fittings.
Avoid using JIC or SAE swivel fittings. If used
always install copper conical sealing washers,
(Connie seals) or fitting seals on fittings.
Double clamp all hose barb fittings.
Avoid using 90º elbow fittings.
Install Sensor(s) at a low point in the fuel system, as
far from the engine as practical. Fuel must travel,
“Up-hill” slightly after leaving the sensor. Verify
correct orientation and fuel flow direction.
If possible, avoid bolting or mounting sensor(s)
directly onto the engine.
Connect all, “Ground” wires to a Ground Buss, or
directly to the Battery’s Negative Terminal. Connect
or, “Ground” wire shields to the engine block.
Never connect Instrument or Sensor “Ground”
wires to the hull, engine block, or other
machinery.
On Instruments with a GPS interface, connect
FloScan’s Data (+) to the GPS signal output.
Connect Data (–) to the GPS signal ground.
Do not connect FloScan’s Data (–) to the GPS
Data (–).
Always use non-illuminated switches for Totalizer
Reset, Port/Starboard Select, Hours/Synch, and
GPH/MPG.
Never use illuminated, or back-lit switches.