Signal cable 660V-MPYCY-16 (JIS cable)
1. Unfasten the clamping gland from the upper cable gland, and remove the gasket and
flat washers.
2. Shorten the cable as appropriate. Remove the vinyl sheath by 600 mm. Remove the
armor by 590 mm.
Armor
Conductors
Armor
Vinyl sheath
Core
φ = 1.25 mm
2
600 mm
590 mm
Figure 2-4 Fabrication of signal cable 660V-MPYCY-16
3. Slide the clamping gland, washers and gasket on the power cable. Fold back the armor
by 5 mm, then put it between washer and cable gland body as below.
Armor (folded back)
Gasket
Seal with putty
after tightening.
Vinyl sheath
Clamping gland
Flat
washer
Cable gland
Flat
washer
Flat
washer
Figure 2-5 Passing clamping gland, washers and gasket on the signal cable
4. Determine the length of the cores considering their location on STB-2 and STB-3. Trim
conductors as appropriate.
5. Ground the armor by inserting it through the two flat washers near the cable gland.
6. Remove the sheath of each core by 6 mm. Fix crimp-on lug FV1.25-4 (Blue, ø4) to
each conductor. Make sure each connection is secure both electrically and mechani-
cally.
7. Lead cable into cable gland, tighten clamping gland and seal with putty.
8. Connect the conductors to STB-2 and STB-3, referring to the interconnection diagram
on page S-1.
9. Check for loose screws and poor contact on crimp-on lugs. Close terminal boards.
10.Grease the fixing bolts for the cover, gasket and tap holes in the scanner chassis.
Attach cover.