A SERVICE OF

logo

22
P/N 211022 01/05
7.
Roll the completed assembly to the desired playing area. Insert the
T-strap (14) through the slot on the back of the base as shown. Secure the unit to ground by
twisting the tie down stake (23) into the ground and hooking the T-strap (14) onto the tie down
stake (23). Fill tank with 33 gallons of water.
8.
Apply the height adjustment and moving label (25) to the
front of the pole as shown.
24
14
23
24
10 ft.
(3.05 m)
25
TWO PEOPLE REQUIRED
FOR THIS PROCEDURE.
FAILURE TO FOLLOW THIS
WARNING COULD RESULT
IN SERIOUS INJURY AND/OR
PROPERTY DAMAGE.
WARNING!
DO NOT ALLOW
CHILDREN TO
ADJUST HEIGHT.
WARNING!
DO NOT LEAVE
ASSEMBLY
UNATTENDED WHEN
EMPTY; IT MAY TIP
OVER.
WARNING!