A SERVICE OF

logo

English – 23
50
100
MAINTENANCE
25
WARNING!
No service procedures must be conducted on the engine or cutting unit unless:
The engine is switched off.
The ignition key is removed.
The ignition cable is removed from the plug.
The parking brake is applied.
The cutting unit is disengaged.
Maintenance schedule
The following is a list of the maintenance which should be conducted on the machine. For the items which
are not described in these instructions go to an authorised service workshop.
Daily
maintenance
before start
= Described in these instructions.
= Not described in these instructions.
Maintenance
Page
Maintenance interval
in hours
1)
First change after 5 hours. Replace after every 25 hours with heavy loads or high temperatures.
2)
During dusty conditions cleaning
and replacement should be more frequent.
3)
For daily use of the machine lubrication should be conducted twice a week.
4)
Conducted
by authorised service workshop.
Check the engine’s oil level 41
Check the engine’s cooling air inlet 31
Check the fuel pump’s air filter 27
Check the steering wires 25
Check the battery 28
Check the safety system 30
Check screws and nuts
Check for fuel and oil leakage
Clean around the silencer
Check the muffler 26
Change the engine oil
1)
41
1)
1)
Replace the air filter’s prefilter
2)
27
Check the cutting unit 33
Check the tyre pressures 60 kPa//8.5 PSI 31
Lubricating the belt adjuster
3)
42
Lubricate joints and shafts
3)
42
Check the V-belts
Check the hydrostat’s cooling fins
Check the transmission’s oil level 42
Adjust the parking brakes 25
Check and adjust the throttle wire 26
Clean the engine’s and hydrostat’s cooling flanges
2,4)
Replace the air filter’s pre-filter and paper filter
2)
27
Replace the fuel filter 27
Replace the plug 29