A SERVICE OF

logo

Step 2: Installing optional drawers
10
Step 2: Installing optional drawers
Step 2: Installing optional drawers
Note: Do not place a scanner shelf on top of a configured stack containing a 2000-sheet, high-capacity
drawer.
Note: Do not use a printer stand with a configured stack containing a 2000-sheet, high-capacity drawer.
If you are installing a 2000-sheet drawer, install it before any other optional drawer. Follow the installation setup instructions
that came with each drawer, and then go to Step 3 to install the duplex unit.
If you are using a printer stand refer to the chart below:
Step 3: Installing the duplex unit
If you installed optional drawers, they must be installed below the duplex unit. The duplex unit must be installed directly
under the printer. Follow the installation setup instructions that came with the duplex unit, and then go to Step 4.
Step 4: Unboxing the printer
Remove the printer from the box, and then remove all packaging from the printer. Follow Steps 1 and 2 of the printer setup
sheet that came with the printer, and then go to Step 5.
MFP Total number of additional 500-sheet drawers allowed
with or without a duplex unit*
123
Ye s Ye s No
*The duplex unit must be installed directly under the printer in any configuration. All other drawers must be
installed under the duplex unit.