A SERVICE OF

logo

- 8 -
SERVICE
Assembly and disassembly should be performed by a
service technician who has been factory trained on MBW
equipment. The unit should be clean and free of debris.
Pressure washing before disassembly is recommended.
Prior to assembly, wash all parts in a suitable cleaner or
solvent.
Check moving parts for wear and failure. Refer to the
Replacement section in this manual for tolerance and
replacement cycles.
All shafts and housings should be oiled prior to pressing
bearings. Also, ensure that the bearings are pressed
square and are seated properly.
All gaskets and seals should be replaced after any
disassembly.
Torque Chart
Engine Shroud Removal
Refer to Shroud & Chassis Assembly, page 12.
1. Disconnect wiring harness (#11) from engine by
unscrewing ring terminal from engine and unplugging
bullet connector from splice terminal (#5).
2. Disconnect automatic grid opener from grid.
3. Remove four bolts (#26), washers (#28), and lock
nuts (#27) securing engine shroud to frame.
4. Carefully lift shroud straight up and tilt to get around
valve block handles. Approximate weight is 85
pounds.
Engine Shroud Installation
Refer to Shroud & Chassis Assembly, page 12.
1. Lift shroud over engine and drive components and
lower it down and around valve block handles. Hold
grid opener out of the way when lowering.
2. Align engine shroud with edges of frame and tighten
four bolts (#26), washers (#28), and lock nuts (#27) in
place.
3. Lift grid opener into position and pin to grid.
4. Connect wiring harness (#11) to engine by grounding
the ring terminal to the engine and inserting the bullet
connector into the splice terminal (#5).
Drum Removal
Refer to Drum Assembly, page 14.
1. Remove engine shroud before attempting to remove
the mixing drum.
2. Disassemble the connecting link on the chain coupler
and remove the chain.
3. Remove spring pin from the hydraulic cylinder’s top
clevis pin, and pull clevis pin halfway out.
4. Rotate cylinder out of engagement with drum and
reinstall clevis pin and spring pin.
5. Mark the front and rear pillow block (#5) locations on
the frame to aid in the alignment during installation.
6. Remove four bolts (#19), lock washers (#20), and
washers (#21) holding drum pillow blocks to frame.
7. Slide mounting bar (#13) out of front support tube.
8. If lifting drum by hoist, wrap chain around main shaft
and pass chain through paddles to stabilize. If lifting
drum by forklift, place blocks on forks to prevent drum
from rolling. Approximate weight is 400 pounds.
SIZE GRADE 2 GRADE 5 GRADE 8
1/4-20 49 in
lbs 76 inlbs 9 ftlbs
1/4-28 56 in
lbs 87 inlbs 10 ftlbs
5/16-18 8 ft
lbs 13 ftlbs 18 ftlbs
5/16-24 9 ft
lbs 14 ftlbs 20 ftlbs
3/8-16 15 ft
lbs 23 ftlbs 33 ftlbs
3/8-24 17 ft
lbs 26 ftlbs 37 ftlbs
7/16-14 24 ft
lbs 37 ftlbs 52 ftlbs
7/16-20 27 ft
lbs 41 ftlbs 58 ftlbs
1/2-13 37 ft
lbs 57 ftlbs 80 ftlbs
1/2-20 41 ft
lbs 64 ftlbs 90 ftlbs
9/16-12 53 ft
lbs 82 ftlbs 115 ftlbs
5/8-11 73 ft
lbs 112 ftlbs 159 ftlbs
5/8-18 83 ft
lbs 112 ftlbs 180 ftlbs
3/4-16 144 ft
lbs 200 ftlbs 315 ftlbs
1-8 188 ft
lbs 483 ftlbs 682 ftlbs
1-14 210 ft
lbs 541 ftlbs 764 ftlbs
1-1/2-6 652 ft
lbs 1462 ftlbs 2371 ftlbs
M 6 3 ft
lbs 4 ftlbs 7 ftlbs
M 8 6 ft
lbs 10 ftlbs 18 ftlbs
M 10 10 ft
lbs 20 ftlbs 30 ftlbs
CONVERSIONS
in
lbs x 0.083 = ftlbs
ft
lbs x 12 = inlbs
ft
lbs x 0.1383 = kgm
ft
lbs x 1.3558 = Nm