CLEARANCES
TABLE 1
INDOOR INSTALLATION
MINIMUM CLEARANCES FROM COMBUSTIBLE SURFACES
Models
Heater Side 122-322
Floor See Note 1
Rear 1"
Water Side 12”
Other Side 1"
Top 1"
Vent 2"
Note 1. Do not install on carpeting.
When installed according to the listed minimum clearances from combustible construction materials, the
Raypak heaters can still be serviced without removing permanent structural construction around the heater.
However, for ease of servicing, we recommend a clearance of at least 24” in front, and at least 18” on the
water connection side. This will enable the heater to be serviced in its installed location, that is, without
movement or removal of the heater.
Clearances less than minimum, may require removal of the heater to service either the heat exchanger or the
burner tray. In either case, the heater must be installed in a manner that will enable the heater to be serviced
without removing any structure around the heater.