A SERVICE OF

logo

(e) Installing the ceiling panel
Attach the ceiling panel to the chamber.
Drawing the panel downwards sets the panel in
position temporarily with the panel catch (at 2
locations).
Remove the socket cover of the air-intake plenum
and pass the 8P sockets through it. (Fix the panel
lead wire to chamber side clamper.) (Fig. 2-17)
Connect the 8P socket (electrical component box
side) to the 8P socket (ceiling panel side) of the
indoor unit electrical component box.
Reattach the socket cover.
Fig. 2-18
Ceiling panel
Panel catch
Installation screws
(M4 × 12)
Duct
connection
flange
Duct connection box
2265_X_S
12