Harbor Freight Tools 41876 Carrying Case User Manual


 
SKU 41876 For technical questions, please call 1-800-444-3353. Page 5
Preparation for Pipe Threading
Your Portable Threading Machine comes fully assembled but will require insertion of the Die prior to operation.
It is important that your read the entire manual to become familiar with the unit BEFORE you use it. Be sure
that you have all parts described in the Parts List. To help you with assembly, please refer to the assembly
diagram on page 7 and the parts list on page 6.
Step 1) Determine the size of the pipe to be threaded.
Step 2) Select the appropriate die to be used. Four different Dies are included with the Threading Machine.
The Dies are the following sizes: 1/2", 3/4", 1", and 1-1/4". The dies are intended for use on
standard schedule 40 and schedule 80 steel pipe.
Step 3) Insert the die into the Worm Gear (7) of the Machine. The dies will fits into the Worm Gear either
from the left or the right side of the tool. Make sure that the die is held in place by the Retaining
Ring (8) before proceeding. The Machine is pressure fitted so once the die is inserted properly, it
may require light tapping with a wooden mallet to remove the die.
Step 4) Verify that the oil can is filled with oil and ready to be used during the threading operation.
Step 5) The Pipe Clamp (29) should always be used to secure and support the pipe during the threading
operation. The round Clamp extension should parallel the pipe.
Step 6) Located in front of the ON/OFF trigger switch is a Forward/Reverse switch which determines the
direction of the threading operation. With the Machine held in the right hand:
Switch in right position = Clockwise rotation
Switch in left position = Counterclockwise rotation
Operation
Now that the proper die is installed, you are ready to insert the pipe, secure it, and begin cutting threads.
Step 1) Insert pipe into the rear of the die - see illustration to
the right. Verify that the inside diameter of the die
matches the outside diameter of the pipe.
Step 2) Make sure that the Clamp (29) is effectively clamping
the pipe and that the pipe is well supported while
threads are being cut. During threading, use the round
Clamp extension for torque on the pipe.
Caution: Make sure that pipe end and threads of the die are
sufficiently oiled at all times. Otherwise the die life
will be shortened and the threads will be rough.
Step 3) Set the Switch to the right (Forward) position. While
holding the grip with one hand, press the trigger in
and pull up on it to turn the machine on. Apply
pressure to the pipe until the die engages the pipe
cutting two to three threads.
Step 4) From this point, the die will automatically be drawn over the pipe and a standard taper thread will
be cut.
Step 5) When the proper amount of threads are cut, release the trigger switch to stop the Machine. Move
the Forward/Reverse switch to the left position (Reverse) pulling in and up on the trigger to turn
the machine on. This will disengage the die from the pipe.
Step 6) When sliding the pipe out of the machine, be careful not to damage the newly cut threads.
REV 12/05, 01/07