A SERVICE OF

logo

10
Book Layout
Chapter 1 – provides an overview of the bh7800 components, cooling air flow, shipping dimensions and
weight and CFM value.
Chapter 2 – provides specific information ensuring the site is ready when the bh7800 arrives. Voltage
fluctuations, grounding and floor loading are some of the topics covered.
Chapter 3 – covers how to power up the bh7800 and how to power down the bh7800. Power distribution
information and power cords required are specified.
Appendix A – provides specifications and requirements necessary to ensure the bh7800 environment
provided is suitable for operating the bh7800.
Appendix B – provides power plug configuration information for the male and female end of the cord set.
Appendix C – provides conversion factors and formulas used for determining site environment
requirements.
Glossary – provides a list of terms most commonly used in this manual.
Index - a quick look up table for common terms and components used in this guide.
Publication History
The Site Preparation guide was never assigned a manufacturing part number. The method for tracking
revisions will be this table.
Table 1 Publication History
Edition Comments
First December 2001 release. CD-ROM, EPSS Web site, and http://docs.hp.com delivery mechanisms.
Second April 2002 release. CD-ROM, EPSS Web site, and http://docs.hp.com delivery mechanisms.
Power dissipation values in appendices were revised.
Third June 2002 release. CD-ROM, EPSS Web site, and http://docs.hp.com delivery mechanisms.
Conversion from MS Word to Framemaker 6.0 to meet Section 508 compliance. Enhanced
graphics and illustrations added.