A SERVICE OF

logo

ERA & EBD SERIES ELECTRIC FRYERS - REMOVAL AND REPLACEMENT OF PARTS
ELECTRICAL COMPONENTS
1. Open electrical component access panel.
2. Disconnect lead wires then remove the
component being replaced.
3. Reverse procedure to install the replacement
component and check for proper operation.
CIRCUIT BREAKER/ SUPPLY
BOX COMPONENTS
1. Remove screw and circuit breaker/ supply box
cover.
2. Disconnect lead wires then remove the
component being replaced.
NOTE: Supply box will contain a circuit breaker on
24kW 208-240V units.
3. Reverse procedure to install the replacement
component and check for proper operation.
F25385 (May 2010) Page 8 of 32