Scheduling an event
117
3. If the event is one hour long, skip to step 5. If the event is longer or shorter than
an hour, tap the time of the event to open the Set Time dialog box.
TIP You can also open the Set Time dialog (to select a start time) by making
sure no event is selected, and then writing a number on the number side of the
Graffiti
®
writing area.
4. Do one of the following:
Tap the time columns on the right side of the Set Time dialog to set the Start
Time, then tap the End Time box and tap the time columns to set the End Time.
Tap All Day to automatically insert the start and end time of the event as
defined in your Date Book preferences.
5. Tap OK.
6. Tap a blank area of the screen to deselect the event. A vertical line appears next
to the time, indicating the duration of the event.
If an event has the same start and end time, the time is only displayed once.
To schedule an event for another day:
1. Select the date you want for the event by doing one of the following:
– Tap the day of the week that you want in the date bar at the top of the screen.
If necessary, tap the Previous week or Next week scroll arrows to move to
another week.
Tap the
time of an
event
Start Time
highlighted
Tap to scroll to
earlier hours
Tap to scroll to
later hours
Tap to change
hours
Tap to change
minutes
Tap to automatically
fill the start and end
times