TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
SEC
16”
16”
16”
16”
16”
16”
16”
To ensure studs are in the correct location
for nailing plywood in the next step, start
measuring from the corner 16”, and then
measure from center to center.
2” x 4” x 90 1/2” (x9) (Not included)
2” x 4” x 118 1/4”X.OTINCLUDED
16d 3” Common NailX.OTINCLUDED
Note: Whenever possible, you should use the surfaces described on Page
7. When this is not possible, we recommend you use a wood platform or a
fi lled wood frame.
!
Note: All lumber must be rated for outdoor use.
!
Note: Surface must be leveled before installation. If the surface is not
properly leveled, the Outdoor Shed will not assemble or function correctly.
Proper surface leveling will save you time in the long run, so please do not
ignore this step.
!
1
SEC
1.2
ALTERNATIVE SITE PREPARATION: OPTION 1 - WOOD PLATFORM ASSEMBLY
%NSUREALLLUMBERUSEDISTREATEDANDAPPROVEDFOROUTDOORUSE"UILDOUTSIDEFRAMETOvXv
outside dimensions:
118 1/4”
93 1/2”
Place the 2” x 4” x 90 1/2” boards on the
inside of the frame. Nail each board in place
with the 16d nails.