A SERVICE OF

logo

3 - 21
CHK
ADJ
ADJUSTING THE VALVE CLEARANCE/
SYNCHRONIZING THE THROTTLE BODIES
9. Install:
all removed parts
NOTE:
@
For installation, reverse the removal proce-
dure.
EAS00050
SYNCHRONIZING THE THROTTLE BODIES
NOTE:
@
Prior to synchronizing the throttle bodies, the
valve clearance and the engine idling speed
should be properly adjusted and the ignition
timing should be checked.
1. Stand the motorcycle on a level surface.
NOTE:
@
Place the motorcycle on a suitable stand.
2. Remove:
•rider seat
fuel tank
T-bar
Refer to “SEATS AND FUEL TANK”.
3. Remove:
•caps 1
4. Install:
vacuum gauge
(onto the pipes)
engine tachometer
(onto the spark plug lead of cylinder #1)
5. Install:
fuel tank
Refer to “SEATS AND FUEL TANK”.
6. Start the engine and let it warm up for sev-
eral minutes.
Vacuum gauge
90890-03094
Engine tachometer
90890-06760