2. Installation procedures
2. INSTA LLATION PROC EDURES
Overview
• Installing the Bottom Carry Handle
• Removing the Bottom Carry Handle
• Installing the Top Carry Handle
• Removing the Top Carry Handle
• Allowed projector positions
•Stackingprojectors
• Suspending the projector from a t russ
• Skewing the projector
• Inclinating and/or rotating the projector
• Aligning stacked projectors
• Dimensions
R5905106 TOP & BOTTOM CARRY HANDLE 28/06/2011
7