Texas Instruments 3000 MCU Cell Phone User Manual


 
SpectraLink Corporation T1 Remote Module Installation
Link WTS – Link 3000 MCU
1.4 Remote Installation Steps (Overview)
Follow these steps to install the T1 Remote Module. Detailed instructions for each of
these steps are contained in this document and other relevant documents in the Link 3000
MCU System Documentation.
1. Prepare site and check components.
2. Install T1 Remote Module at the local site (location where the Primary Shelf is
located.)
3. Connect T1 Remote Module at the local site to the Intershelf Junction Panel and
T1 facilities.
4. Install Expansion Shelf at remote site.
5. Install T1 Remote Module, Shelf Controller, and Interface Modules at remote site.
Note that GPS timing may be required when remote and main shelves are within
600-800 feet of one another.
6. Connect T1 Remote Module at the remote site to the Shelf Controller and T1
Facilities.
7. Install any additional Expansion Shelves at remote site, and connect Expansion
Shelves at the site.
8. Connect RJ-21 cables for telephone lines and Base Stations to Interface Modules
at remote site.
9. Configure remote system and register Wireless Telephones.
Part Number: 72-0059-06-E.doc Page 10