A SERVICE OF

logo

EPSON Stylus Pro 7600/9600 Revision A
Disassembly & Assembly Disassembly and Assembly of Ink Supply Mechanism 192
4.5 Disassembly and Assembly of Ink Supply
Mechanism
4.5.1 C472_SUB-B Board
1.
Remove the L Side Cover. (p.163)
2. Disconnect the seven FFCs (ink cartridge) and the two FFCs (Main Board/
Maintenance Tank) on the C472_SUB-B Board found at the left side of I/H Frame.
(See Figure 4-62)
3. Disconnect the connector of the Release Sensor (I/H Lever).
4. Remove the four screws (M3
×
6) and remove the C472_SUB-B Board.
Figure 4-62. Disconnecting the C472_SUB-B Board Connectors
C A U T I O N
When connecting an FFC, take great care not to insert it aslant.
(Inserting aslant can cause a short circuit of signals, thus resulting
in broken circuit elements.)
FFC (CSIC Relay Board) ×7
FFC (Maintenance Tank)
FFC (Main Board)
Screws (M3×6) ×4
Release Sensor (I/H Lever)