E. Reinstall the Phase 1 or Phase 3 top Breaker
Stab using the original mounting hardware.
NOTE: The Line Side HV Wires are longer than
necessary and are cut during the following
steps. Before cutting the wires, be sure
that sufficient length is left so that the
connections can be made to the correct
Breaker Stabs.
F. Route the Line Side HV Wires to the Phase 1
and 2 or Phase 2 and 3 top Breaker Stabs.
Cut each wire to a suitable length for
connection.
G. Strip an appropriate length of insulation then
attach a .250 ring terminal to each HV Wire.
I. Connect the other HV Wire to the Phase 1 or
Phase 3 top Breaker Stab using the (1)
.250-20 × .500" bolt, (1) lock washer, and
(1) flat washer supplied.
Fig. 43 Breaker Ready for HV Wire Attachment
Fig. 44 HV Wire Connected to the Phase 2
Breaker Stab
Fig. 45 HV Wire Connected to the Phase 1
Breaker Stab
D. Remove the Retaining Plate and mounting
hardware that secures the Phase 2 Breaker
Stab. Save the mounting hardware but scrap
the Retaining Plate.
H. Remove one of the hex cap bolts that secure
the Phase 2 Breaker Stab. Connect a HV Wire
to the Phase 2 Breaker Stab using the hex cap
bolt just removed.