
ii 5707070-A
Advanced Energy
®
installation
horizontal pipe mounting
2-8
pre-installation procedures
2-2
procedures
2-9
straight run requirements
2-5
tools required
2-2
vertical pipe mounting
2-8
introduction
1-1
K
K factor, setting 2-22
keypad
lockout switch
4-4
L
LCD display
rate selection
2-18
totalizer selection
2-19
LEDs
ALARM
2-16
ECHO
2-20
indications
2-16
POWER
2-16
specifications
4-4
lockout switch, keypad
4-4
low flow cutoff
setting
2-23
specifications
4-5
low flow rate reading, troubleshooting
3-6
M
main components 1-2
measurement accuracy
4-2
meters per second, reading
2-24
mounting
horizontal pipe
2-8
vertical pipe
2-8
N
normal operation 2-25
O
operating temperature range
electronics enclosure
4-2
transducers
4-3
operation
first time
2-17
normal
2-25
portable battery
2-25
output signals
alarms
4-4
analog output
4-3
P
performance specifications 4-1
physical specifications
4-2
pipe conditions, specifications
4-1
pipe data
4-9
cast iron pipe
4-10
ductile iron pipe
4-11
PVC
4-9
stainless steel
4-9
steel
4-9
pipe material
assessing condition
2-5
portable battery operation
2-25
power adaptor
4-3
power failure, backup
4-4
power requirements
AC
4-3
DC
4-3
procedures
connecting power to electronics enclosure
2-13
connecting transducers to electronics
enclosure
2-11
first time operation
2-18
mounting the electronics enclosure
2-13
mounting transducers
2-6
mounting transducers to the pipe
2-9
process
determining application requirements
2-3
product introduction
1-1
PVC pipe data
4-9
R
rate indications, units of measure 4-4
rate selection
2-18
reference
pipe data
4-9
velocity conversion tables
4-12
reflectors
air bubbles and particles
1-3
sonic
1-3
repeatability
4-2
returning units for repair
3-12
S
sales, EMCO contact information 3-11
sensitivity, flow
4-1