Honeywell 4909 CPVC Cell Phone User Manual


 
Specifications and Model Selection Guide
7/99 4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual 9
049
TABLE IV Selection 09 08
Leadwire Length ’7 ft. Leadwire X7
20 ft. Leadwire 20
Junction Head (Aluminum) X1
TABLE V
Valve/Cell Material Material
4909 Stainless Steel (SS) Valve Includes SS Valve assembly and 02
c
Assembly Standard insertion cell
4908 PES Replacement Cell for Standard insertion cell only 02
c
4909 SS Valve Assembly
4909 CPVC Valve Assembly Includes CPVC assembly and 03
d
standard CPVC Support tube
(15 3/8") and cell
4908 PES Replacement Cell for Cell only 03
d
CPVC Valve Assembly
TABLE VI
Special Mounting Options - select one option per unit
None 000
SS support tube for 4909 SS Valve 930
e
assemblies only. Use Table V
Option = 02
4908 replacement cells for 4909 SS 930
e
Valve Assembly containin
g
SS Support
tube. Use Table V Option = 02
Special insertion lengths for new/ Uses special insertion cell to 910
hh
replacement cells for 4909 SS increase standard insertion
Valve Assemblies. Only available cell depth by 4.4"
for Table V Option = 02 Uses special insertion cell to 920
increase standard insertion
cell depth by 8.8"
(Note 4)
Uses special insertion cell to 925
increase standard insertion
cell depth by 13.2"
(Note 4)
Uses special insertion cell to 940
hh
decrease standard insertion
cell depth by 4.4"
Extended Length CPVC Support tube. Supplies special CPVC 950
j
Only available for Table V Option = 03 support tube (21 3/8") to
increase cell insertion depth
by 6.0" in a new CPVC Valve
Assembly. Note: Allow
additional 6.0" for cell removal