Platinization and Platinum Black
7/99 4909 CPVC Conductivity Cell Insertion/Removal Assembly– Operations Manual 23
WHITE
BLACK
RED
GREEN
Cell
Temp.
Comp.
W
K
SH
G
R
Conductivity/Resistivity
Analyzer
Note 1
GND
K
W
G
R
#2 Temp
Compensator
#1 Temp
Compensator
Cell 2
Electrodes
Cell 1
Electrodes
(Note 5)
(Note 5)
Five Point Terminal Board.
Each Terminal Will Accept
#16 Gage Max. Wire
A
n a l y ze r I np u t C on n e c ti o n s
20 ft. max.
Red
Green
Black
White
Cell cable is approx. 0.250"
(6.4mm) O.D. max. with 4
conductors of #18 AWG
wire, 7 or 20 foot length.
D i r e c t C e l l t o A n a l y z e r I n s t a l l a t i o n
NOTES:
1. For pure water samples in non-conductive (plastic, glass, etc.) piping, ground the black cell electrode lead near the cell.
Alternatively, connect to the 9782 ground screw as shown dotted. Do not ground 10, 25, or 50 constant cells.
2. 9
7 8 2C - S 0 (only)
Use 22 gage minimum coaxial cable type RG59/U connecting shield to terminal "SH" only.
3. 9
7 8 2 C - S 0
For cable runs of up to 500 ft., use: 18 gage minimum, three conductor cable.
For cbale runs of 500 - 1000 ft., use: 16 gage minimum, three conductor cable.
9
78 2C - W0 [coax and shield (SH) not used]
For cable runs of up to 500 ft., use: 18 gage minimum, four conductor cable.
For cable runs of 500 - 1000 ft., use: 16 gage minimum, four conductor cable.
4. Cell to analyzer cables are considered low level. Run seperate from high level wiring.
5. If 2 Cells are to be applied, the same guidelines are applied to Cell 2 as wereused for Cell 1.
An a l y ze r I np u t C on n e c ti o n s
1000 ft. max.
Red
Green
Black
White
R
G
K
W
20 ft. max.
Coax Cable
Shield
Junction Box
Note 3
Note 2
C e l l t o A n a l y z e r T h r o u g h J u n c t i o n B o x
a
/
n 23346
Ce l l A s s e mb l y Co n n e ct i o n s
4905
I II III IV
V
VI
- - 333 - X1
4973
4974
III III
IV
- 333 - X1 -
V
4908
I II III IV V VI
- - 333 - X1
4909
VII
Ce l l A s s e mb l y Co n n e ct i o n s
4905
I II III IV
V
VI
- - 333 - X1
4973
4974
III III
IV
- 333 - X1 -
V
4908
IIIIII IVVVI
- - 333 - X1
4909
VII
W
K
SH
G
R
Conductivity/Resistivity
Analyzer
Note 1
GND
K
W
G
R
#2 Temp
Compensator
#1 Temp
Compensator
Cell 2
Electrodes
Cell 1
Electrodes
(Note 5)
(Note 5)
Note 3
Figure 5-4 Installation Diagram-Cat. 4909 Cells with 7 or 20 Foot Leads
Connected to 9782 Conductivity/Resistivity Analyzer