Fig. 26
4. Reverse the procedure to install new
transformer.
5. Reinstall power supply box and check operation.
Control Board
1. Remove POWER SUPPLY BOX.
2. Note location of wiring to relay control board and
remove wiring.
Fig. 27
3. Remove screws and remove from box.
4. Reverse the procedure to install new relay
control board.
5. Reinstall power supply box and check operation.
Filter Relays
1. Remove POWER SUPPLY BOX.
2. Note location of wiring to the relays and remove
wiring.
Fig. 28
3. Remove screws and remove from box.
4. Reverse the procedure to install new relays.
5. Reinstall power supply box and check operation.
BURNER ASSEMBLY
Disconnect the
electrical power to the machine and
follow lockout / tagout procedures.
Shut off the gas before servicing the
unit.
All gas joints disturbed during
servicing must be checked for leaks. Check with a
soap and water solution (bubbles). Do not use an open
flame.
1. Remove gas line from gas valve.
2. Remove electric plug connector from gas valve.
3. Unbolt high limit thermostat clamp from transfer
tube.
VK and TR GAS FRYERS W/Wo KleenScreen PLUS - REMOVAL AND REPLACEMENT OF PARTS
F45474 (0413) Page 16 of 55