Furuno 16 Cell Phone User Manual


 
1. OPERATIONAL OVERVIEW
1-9
TEST-DISTRESS ALERT Sending test distress alert to LES
WAITING FOR ACTIVATION Waiting start of PV test
WAITING FOR TEST RESULT Waiting for results of PV test
CLEARING Clearing PV test
PV TEST is Completed. PV test is completed.
PV TEST Failure. PV test failed.
(3b) RF CON board program version number
DCE F16 Ver. XX (XX = Version Number)
(4) Frame synchronization
Blank Changing channel, or during transmission
SYNC (NCS) Synchronizing with NCS
SYNC (LES) Synchronizing with LES
MES Sig. Ch Transferring to MES signaling channel
MES Msg. Ch Transferring to MES message channel
UNSYNC Out of synchronization
Retuning Synchronizing with NCS or LES
(5) Ocean region receiving
No display Out of synch with satellite
AOR-W Atlantic Ocean Region-West
AOR-E Atlantic Ocean Region-East
IOR Indian Ocean Region
POR Pacific Ocean Region
(6) Logging status
LOGOUT Logged out with ocean region
LOGIN Logged in with ocean region
LOGIN (Flashing) Logging in with ocean region