![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/0/0a/00a19d78-057b-4202-a355-9d23cfb48d1a/00a19d78-057b-4202-a355-9d23cfb48d1a-bg11.png)
2 - 3
No. 99MBC071A
2. SETUP
IMPORTANT • If the dummy ID unit is still mounted, “ ”
is displayed in the lower section of the display. If
this is the case, turn off the power and replace the
dummy ID unit with a proper ID unit.
PROG
• If the ID unit is not installed or if the serial number of
the Measuring Unit is not consistent with that on the
ID unit, the system will not work and an error code
as shown at the right will be displayed at power on.
At the same time, the 6-digit serial number of the
measuring unit is displayed for confirmation.
If the
C
key has been pressed to enter the ready state, measurement can be
automatically started. However, the measuring accuracy can not be guaranteed.
Signal cable
ID unit
Remote interlock
GND lead wire
Power cord
Step 3: Connecting the signal cable
Insert the round plug (12-pin) of the signal cable into the upper connector (12-pin)
on the rear panel of the emission unit. Tighten the ring screw to firmly secure the
connectors.
Insert the square connector (15-pin) on the other end of the signal cable into the
connector “TRANSMITTER-1” at the upper left of the display rear panel and tighten
the securing screws.
Step 4: Connecting the power cord and GND lead wire
Connect the supplied power cord to the AC connector at the upper right on the rear
panel of the Display unit. Also be sure to ground the Display unit with the GND lead
wire for improved resistance to noise.
Grounding must be done properly:
Connect the supplied grounding wire, after cutting it to the minimum length, to the
grounding terminal provided on the Display Unit. This unit operates as a precision
analog processor and, at the same time, a high-speed calculation unit. To enhance
resistance against electrical interference and to increase safety, do not neglect
grounding.
PROG